LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Defence Ministry: Illegal construction at Aidu wind farm must stop 

Credit:  Editor: Aili Vahtla | Source: BNS | err.ee ~~

The Ministry of Defence said on Tuesday that it wants Aidu Tuulepark OÜ, a company owned by businessmen Oleg and Andres Sõnajalg, to first halt illegal construction activity at the wind farm, as the company does not have a construction permit for the building thereof, before it can discuss anything else.

“The Ministry of Defence has always been solution-oriented,” the ministry said in an answer to BNS. “We have constantly been in dialogue with developers, including Aidu Tuulepark OÜ, to find solutions for eliminating alerts in the Estonian Defence Forces’ (EDF) advance warning systems caused by wind farms being built higher and higher.”

Eleon, another company owned by the Sõnajalg brothers, said on Tuesday that it is prepared to install wind turbines with a total height of 185 m instead of the previously planned 255 m turbines in order to persuade the ministry to allow the Aidu wind farm to be built, the construction of which has been ordered temporarily halted by a court.

“The developer has submitted different theoretical calculations to the Ministry of Defence over time, as well as claims regarding new technical solutions, but thus far, none of these has solved the problems,” the ministry said. “As far as it is known, no such technology has been invented yet which would neutralise the negative effect of wind farms on air surveillance radars or radio systems.”

The ministry expects Aidu Tuulepark OÜ to first halt its illegal construction, which has continued in spite of a court temporarily suspending wind farm’s construction permit.

Source:  Editor: Aili Vahtla | Source: BNS | err.ee

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky