[ exact phrase in "" • ~10 sec • results by date ]

[ Google-powered • results by relevance ]



LOCATION/TYPE

News Home
Archive
RSS

Subscribe to RSS feed

Add NWW headlines to your site (click here)

Sign up for daily updates

Keep Wind Watch online and independent!

Donate $10

Donate $5

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Publications & Products

Photos & Graphics

Videos

Allied Groups

One of Great Falls’ first wind turbines coming down  

Credit:  Great Falls College's broken wind turbine dismantled | Great Falls Tribune | July 12, 2018 | www.greatfallstribune.com ~~

Great Falls College MSU is removing the wind turbine from its campus. Deconstruction is expected to be complete next week. The wind turbine was purchased used from the University of North Dakota. It had been installed at the wind farm near Raynesford before being moved to GFC MSU.

The turbine, which is no longer operational, stopped working in November and the cost to fix and continually maintain it is prohibitive.

The purchase and installation of the wind turbine was paid for by the Wind Montana grant. Initially, it provided energy to the college and was a training tool for the Sustainable Energy Technician program, which evolved into the Renewable Energy Technician and Industrial Technician programs. These programs teach students the broad set of skills needed to maintain equipment in all sorts of industrial settings, including renewable energy.

The wind turbine, located immediately south of GFC MSU, was operational from June 2010 to November 2017. During that time it produced approximately 258,000 kwh of electricity, which were used to supplement power to the trades building and the chiller units.

As the turbine comes down, the college stays focused on the future. The concrete pad and electrical conduit will remain.

“By leaving the concrete pad and electrical system, we leave open the opportunity for Great Falls College to explore future renewable energy opportunities,” said Dr. Susan Wolff, CEO and Dean at Great Falls College MSU.

Capcon Construction will dismantle and remove the structure. Parts that are still usable will be salvaged and the remainder of the windmill will be used for scrap.

Source:  Great Falls College's broken wind turbine dismantled | Great Falls Tribune | July 12, 2018 | www.greatfallstribune.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

Wind Watch relies entirely
on User Funding
Donate $5 PayPal Donate

Share:

Tag: Accidents


News Watch Home

Get the Facts Follow Wind Watch on Twitter

Wind Watch on Facebook

Share

CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.
Share

Wind Watch on Facebook

Follow Wind Watch on Twitter