LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Wind-power system off Fukushima performs poorly: sources 

Credit:  JIJI | Jun 25, 2018 | www.japantimes.co.jp ~~

Japan’s largest offshore wind-power generation facility, located off Fukushima Prefecture, hardly ever reaches its output capacity of 7,000 kilowatts, sources have said.

The turbine operates in an experimental offshore power-generation project run by the Ministry of Economy, Trade and Industry that was launched in fiscal 2011, soon after the March 2011 earthquake, tsunami and subsequent nuclear accident at the Fukushima No. 1 nuclear power plant in the prefecture.

The ministry plans to continue the project until the end of fiscal 2018 in order to determine an appropriate size for such a power generation facility, the sources said Thursday.

The project is being undertaken by a consortium led by major trading house Marubeni Corp. Other members include Mitsubishi Heavy Industries Ltd. and the University of Tokyo.

The group will try to operate the facility at its maximum output at the end of this year or later. In summer, however, its output is expected to be around only 4,000 kilowatts, because winds tend to be mild during the season, sources said.

The Fukushima Prefectural Government aims to increase the total capacity of offshore wind-power generation facilities in the prefecture to 2 million kilowatts by fiscal 2030, as part of efforts to promote post-disaster reconstruction through the development of renewable energy sources.

In the industry ministry project, a total of three floating wind turbines have been established some 20 kilometers off the prefecture. For this, central government expenditures totaling ¥58.5 billion have been secured over years through fiscal 2018.

The 7,000-kilowatt facility, installed in 2015, has faced several operational problems, and the only time it reached its full capacity was for six hours during a safety test in December 2017, sources said.

The ministry will examine whether such a huge wind-power generation facility can be put to practical use by using data obtained through the project, a ministry official said.

Source:  JIJI | Jun 25, 2018 | www.japantimes.co.jp

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky