LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Windfarm sought again for Spink X 

Credit:  By Lynda Kiernan | Leinster Express | 30 May 2016 | www.leinsterexpress.ie ~~

A company that withdrew an application for a windfarm near Spink in 2013, has reapplied for shorter turbines, but for more of them.

Galetech Energy, an agent for Pinewoods Wind Limited, is now applying to Laois County Council for permission to erect 11 wind turbines, 136.5 metres tall on land south of Ballinakill, bordering with Kilkenny.

In December 2013 the Cavan company unexpectedly withdrew an application to the council for a windfarm on the same site.

That application was for eight wind turbines 152 metres tall, in the same townlands of Knockardugar, Boleybawn, Garrintaggart, Ironmills and Graiguenahown.

A week beforehand, Gaeltech was refused planning permission by An Bord Pleanála for ten 170 metre turbines in Offaly, as it would “seriously injure the visual amenities of the area”.

Gaeltech had got a warning from Laois’ planning enforcement section earlier in 2013, when it left an 80 metre wind measurement mast up at the Pinewoods site, months past a 15 month deadline, later getting retention permission.

Now it is seeking permission for a permanent mast there, 85 metres tall, as well as the 11 turbines and foundations, crane hardstandings, a 110kV substation, 7 site entrances, 5.4 kilometres of site access tracks, underground electricity and communications cabling, two single circuit towers of 26.5 metres and other works.

The application will include an Environmental Impact Statement and a Natural Impact Statement.

Public submissions can be made to Laois County Council for five weeks after the application is lodged.

Laois’ only windfarm is in nearby Gortahile, with eight turbines 125 metres tall.

Source:  By Lynda Kiernan | Leinster Express | 30 May 2016 | www.leinsterexpress.ie

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky