[ exact phrase in "" ]

[ Google-powered ]

LOCATION/TYPE

News Home
Archive
RSS

Subscribe to RSS feed

Add NWW headlines to your site (click here)

Sign up for daily updates

Keep Wind Watch online and independent!

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Publications & Products

Photos & Graphics

Videos

Allied Groups

Countryside campaigners ‘delighted’ as Bideford wind turbine appeal is dismissed  

Credit:  North Devon Journal | March 04, 2016 | www.northdevonjournal.co.uk ~~

Countryside campaigners are “delighted” after an appeal for a large wind turbine near Bideford has been dismissed by the planning inspectorate.

The application for a 67-metre hilltop turbine, at Eastleigh Barton, which would have powered approximately 386 homes, was refused in October 2014.

The appeal was made by Murex Energy Limited against the decision of North Devon District Council.

Paul Griffiths, (corr) the planning inspectorate who refused the appeal, said the main issues he had to consider were the effect of the proposal on the character and appearance on the landscape, the nearby designated heritage assets and the potential visual impact on local residents.

He added in his report: “That analysis needs to be carried out in the context of any benefits the proposal would bring forward.”

There is a significant number of designated heritage assets within a 2km radius of the proposed location, these include Eastleigh Barton, a Grade II* listed building and Eastleigh Manor House, a Grade II* listed building.

Mr Griffiths said the listed building “would be harmed” if the appeal was granted.

In conclusion of his report, Mr Griffiths did say the proposal would bring forward benefits by “generating electricity from a renewable source” but added the proposal would have a “significant adverse impact” on the receiving landscape, “harmfully impinging on the setting”.

“It would have a negative effect on the living conditions of local residents that would, in one case at least, be significant,” he added.

” In my judgement, while I recognise that the harmful impacts of the proposal would be temporary and reversible, they are of such magnitude that the benefits the scheme would bring forward are insufficient to justify them.”

Countryside campaigners, CPRE Devon, said they were delighted with the news.

Penny Mills from CPRE Devon, who had objected to the proposal, said they were very pleased that the inspector had dismissed the appeal.

“This proposal for a large commercial wind turbine at this site had been in the pipeline for some time,” she said.

“There had been strong opposition to it right from the start from local residents, so I know that they will be very relieved that this will not be going ahead.”

The Journal has contacted Murex Energy Limited for a comment.

Source:  North Devon Journal | March 04, 2016 | www.northdevonjournal.co.uk

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

Wind Watch relies entirely
on User contributions

Share:

Tag: Victories


« Later PostNews Watch HomeEarlier Post »

Get the Facts Follow Wind Watch on Twitter

Wind Watch on Facebook

Share

CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.
Formerly at windwatch.org.

HOME
Follow Wind Watch on Twitter

Wind Watch on Facebook

Share