LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

WHAT TO DO
when your community is targeted

Get weekly updates
RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Iberdrola weighs 100MW in Maine 

Credit:  13/01/2015 | renews.biz ~~

Spanish developer Iberdrola Renewables is laying the groundwork for a 100MW wind farm in Maine, US.

“The prospective project is an early to mid-stage development with four met towers up and some field studies done,” Iberdrola spokesman Paul Copleman told reNEWS.

The Fletcher Mountain scheme will feature 30 to 35 turbines, depending on turbine type and final layout.

The wind farm would interconnect via a 115kV radial transmission line into utility Central Maine Power Company’s (CMP) Wyman Hydro substation.

Since CMP is also an indirect subsidiary of Iberdrola, the state Public Utilities Commission must sign off on an interconnection request.

Maine law prohibits power distribution companies from owning generation assets. For now, the developer is seeking commission approval for CMP to negotiate a transmission line right-of-way and carry out some engineering.

Iberdrola has leased around 10,000 acres of land in Somerset County and the developer aims to submit a project permit application to the state Department of Environmental Protection this summer.

“There is still plenty of homework to do as we evaluate the site, work to define a possible layout, continue multiple studies and meet with local and regional stakeholders,” added Copleman.

In 2013, the Fletcher Mountain project was awarded a 15-year power purchase agreement with a group of four Massachusetts utilities. However, Iberdrola cancelled the contract after failing to receive corporate approval, according to a regulatory filing.

Elsewhere in Maine, Iberdrola is conducting wind studies at a site in Washington County in the north-east corner of the state.

Source:  13/01/2015 | renews.biz

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Contributions
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky