LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Fourmile Ridge wind project approved, moves forward 

Credit:  Elaine Blaisdell | Cumberland Times-News | April 17, 2014 | www.times-news.com ~~

FROSTBURG — The Federal Aviation Administration has approved the Fourmile Ridge wind project in eastern Garrett County and site preparation started April 7, according to Frank Maisano, a wind industry spokesman. The current notice listed on the FAA website for the project is for a small change in turbine location.

The project was hinging on the decommissioning of the Grantsville VOR/DME system, which drew opposition from Ed Kelley, manager of the Garrett County Airport, and the Maryland Aviation Administration. The Grants-ville VOR/DME system will be decommissioned, according to Maisano.

VOR/DME refers to a combined radio navigation station for aircraft consisting of two beacons placed together.

“The decommission of the Grantsville VOR would leave Garrett County and Cumberland airports without a ground-based approach and would eliminate numerous instrument procedures, including six instrumental approach procedures, nine standard arrival routes, four victor airways and one remote communication outlet,” Kelly previously said in a letter to Melinda George of the FAA. “The loss of procedures and services could severely impact the safety of general, commercial, emergency and military aviation within the now served VOR/DME.”

The Fourmile Ridge project started out as a Synergics project with 24 wind turbines and was revised to an Exelon project with 16 wind turbines in the Frostburg Road area.

The Maryland Public Service Commission approved the Fourmile wind project last year.

Construction on the project is slated for completion by early November with testing and plans to begin commercial operations by mid-December 2014, according to Maisano.

Source:  Elaine Blaisdell | Cumberland Times-News | April 17, 2014 | www.times-news.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky