LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Paypal

Donate via Stripe

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

State schedules wind energy hearing at BCC 

Credit:  Staff Reports | January 15, 2014 | www.iberkshires.com ~~

PITTSFIELD, Mass. – The state’s renewed look at wind siting regulations will return to the Berkshires on Jan. 27.

The Department of Public Utilities scheduled the hearing on Monday, Jan. 27 from 5 to 8 p.m. at Berkshire Community College. The DPU has taken up the research into how to choose and permit the location of land-based wind energy facilities.

The DPU is leading this investigation that became a hot topic statewide in 2011, when Gov. Deval Patrick proposed a law that would create one group to permit all of the state’s wind-turbine projects. That law was opposed in the Berkshires because there are numerous wind sites identified in area and the statewide group could eliminate local control.

That bill never make it through the legislative process. Now, the DPU is particularly looking at land-based wind energy issues such as design, environmental and human health, safety, construction impacts, socio-economic impacts, decommissioning and the review process for wind projects.

In the end, the department will be crafting guidelines for permitting authorities to follow in handling proposed projects.

This most recent investigation includes the Department of Energy Resources, Clean Energy Center, Department of Environmental Protection and the Department of Public Utilities.

The Berkshire Community College hearing is just one of five the group is holding across the state. The first hearing was on Thursday at Bunker Hill Community College; second on Monday at Mount Wachusett Community College; the third will be at Barnstable High School on Jan. 22; BCC hosts the fourth; and the public hearings conclude with Gloucester High School on Jan. 29.

If those unable able to attend, the DPU is accepting written comments until Feb. 4. That date was already extended from a proposed December deadline.

DPU Wind Siting Investigation 2013/2014

Source:  Staff Reports | January 15, 2014 | www.iberkshires.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Paypal
(via Paypal)
Donate via Stripe
(via Stripe)

Share:

e-mail X FB LI TG TG Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook

Wind Watch on Linked In Wind Watch on Mastodon