LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Brechfa Forest wind farms power line corridors unveiled 

Credit:  BBC News | 10 January 2014 | www.bbc.co.uk ~~

Plans to run power lines through a forest as part of a controversial wind farm project in Carmarthenshire, have been unveiled.

Approval has been given for some of the tallest turbines in Wales to be built in the Brechfa Forest.

But opponents are unhappy that Western Power Distrubution (WPD) wants to connect them with double-poled wooden structures up to 18 metres high.

Carmarthenshire council and others want the proposed power lines to be buried.

WPD, the company which is responsible for connecting the electricity from the planned wind farms to the distribution network announced the corridors for the route on Friday.

The preferred route will join existing overhead lines south of Carmarthen.

Two of the wind farms at Brechfa Forest East and Brechfa Forest West have already received planning permission from UK government’s Energy Minister Ed Davey.

Residents will now have the chance to share their views on the proposals during public consultation in the coming weeks.

Andrew Hubbold from WPD said: “It’s really important to us to be sure that we are putting forward the best possible plan for this connection.

“In this case that means we’ve had to take a little longer than originally planned to review the information we gathered last year before deciding on preferred route corridors.

“Now that we have chosen these preferred route corridors the next step for us is to identify the most suitable paths, known as ‘alignments’, through these corridors.

“We will then take our proposals out to local people so that they will have a chance to make their voices heard during consultation and what they tell us will help us develop our plans.”

Carmarthenshire residents will then have another chance to have their say during formal consultation in September 2014 before WPD puts its application before the Planning Inspectorate at the end of 2014.

In September 2013 Carmarthenshire council launched an e-petition on the UK Government website.

Members believe the 132,000-volt power lines should be buried underground, rather than be carried on wooden poles.

Source:  BBC News | 10 January 2014 | www.bbc.co.uk

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky