LOCATION/TYPE

NEWS HOME


[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]

Archive
RSS

Add NWW headlines to your site (click here)

WHAT TO DO
when your community is targeted

Get weekly updates
RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Wind turbines proposed within city limits 

Credit:  By STEPHANIE IVANKOVICH - Staff Writer | Times-Republican | December 6, 2013 | www.timesrepublican.com ~~

Optimal Renewables LLC has made a proposal to build two roughly 445-feet wind turbines within city limits to distribute energy locally.

The proposal to build the wind turbines is on a farm parcel between East Merle Hibbs Boulevard, 18th Street and Iowa Avenue East.

“Alliant Energy specifically services lots of areas in Marshalltown,” said Karsen Rumpf, lead project developer of Optimal Renewables LLC. “So those areas powered by Alliant Energy will potentially have power that will potentially come from our turbines that we are developing there.”

All of the energy would stay local.

“This is not energy that will be transported long distances to other areas in the country,” Rumpf said. “This is energy that will be used for local energy demands.”

The owners of the wind turbines would be Building Energy, an Italy-based company. Optimal Renewables LLC is the developer of the wind turbines and works with Building Energy in community scale projects.

“We connect the distribution power lines and the energy of the turbines will be distributed locally throughout the city of Marshalltown based on the demand of energy that is needed,” Rumpf said. “We’re not looking to do a large scale project like others out there. What we will deal with is matching the energy demand in certain areas with energy of the turbines.”

At the Planning & Zoning Commission meeting Thursday the proposal will get a recommendation of support or denial for the Board of Adjustment meeting Dec. 17, then get a final approval or denial.

“If anybody has any specific questions about the proposal they are encouraged to come to the Planning & Zoning Commission meeting or the Board of Adjustment meeting, or give me a call and we can talk through it,” said Steven Troskey, city planner.

Troskey can be reached at 641-752-3154.

Source:  By STEPHANIE IVANKOVICH - Staff Writer | Times-Republican | December 6, 2013 | www.timesrepublican.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Contributions
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky