Wind Watch is a registered educational charity, founded in 2005. |
Watch 200ft wind turbine tower toppled in Torrington CT
Credit: ireport.cnn.com ~~
Translate: FROM English | TO English
Translate: FROM English | TO English
Demolition of 200ft (61m) wind turbine tower at Klug Hill Farm in Torrington CT. Optiwind was an energy startup developing a mid-sized wind turbine design. This tower is a prototype built in 2009. Financial difficulties forced Optiwind to close its doors in early 2013, leaving the tower behind. With no other suitable use for the tower, decision was made to bring it down. After removing all the support braces, the three main columns were cut with plasma torch (the last one from the passenger seat of an ATV) , and a gentle tug with a tractor did the rest. Aerial shots captured using DJI F550 hexacopter with Gimbal mounted GoPro Hero3.
This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.
The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.
Wind Watch relies entirely on User Contributions |
(via Stripe) |
(via Paypal) |
Share:
Tag: Video |