LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]



Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

City to have wind farm say 

Credit:  South Wales Evening Post | August 31, 2013 | www.thisissouthwales.co.uk/ ~~

Councillors in Swansea are to have an official say on a giant wind farm scheme off the Gower coast.

The authority is to become a formal consultee on the Atlantic Array project.

A report putting forward the idea went before members of the Development Management and Control Committee.

The off-shore wind farm proposal has been earmarked for development in the Bristol Channel and will include the Gower coastline, along with Lundy and North Devon.

The UK planning inspectorate will have the final say on the plans.

If given the go-ahead it is expected to get under way in 2016 and the offshore infrastructure is expected to take between one and two years to build.

Grid connection works will be put in place onshore in North Devon if permission is granted.

Richard Jones, major projects team leader on Swansea Council, said the authority would have to register its interest in having a say over the scheme.

He added: “It is recognised however that proposed nationally significant infrastructure project schemes located in offshore locations have a potential visual impact on local authorities which are not identified as ‘A’ or ‘B’ authorities.

“In these circumstances, the planning inspectorate will consult the local authority(s) within a 35km zone of visual influence identified from the nearest element of the proposed development to the shoreline.

“The City and County of Swansea falls within this zone and is identified as a non-prescribed consultation body.”

He added: “To continue its involvement in the process it will be necessary therefore for the City and County of Swansea to register its interest in the proposals by making relevant representation to the planning inspectorate by September 16.”

By backing the step to become a formal consultee the local authority will now be able to request to speak at a preliminary meeting over the scheme and put forward a detailed response to the planning inspectorate.

Source:  South Wales Evening Post | August 31, 2013 | www.thisissouthwales.co.uk/

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky