Wind Watch is a registered educational charity, founded in 2005. |
Turbines stop at Fullabrook as wind farm closes down for 15 days
Credit: North Devon Journal | August 14, 2013 | www.thisisnorthdevon.co.uk ~~
Translate: FROM English | TO English
Translate: FROM English | TO English
The country’s biggest on shore wind farm has been turned off for over two weeks meaning the 22 turbines has not been producing any power since last week.
Fullabrook Wind Farm, near Barnstaple, has not been operating since August 5 and will be not back up and running until August 20.
ESB International, who operate the site, confirmed the turbines have been switched off for the 15 day period to enable annual maintenance to take place.
The wind farm, which has been operating since 2011, produces enough electricity to power 30,000 homes.
This is not the first time the wind farm has been shut down this year – it was shut down for four days in May for maintenance and was shut down a further two times last year.
This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.
The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.
Wind Watch relies entirely on User Contributions |
(via Stripe) |
(via Paypal) |
Share: