LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]



Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Paypal

Donate via Stripe

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Do wind turbine operators “influence” noise testing? 

Credit:  Windwise ~ Massachusetts | August 6, 2013 | windwisema.org ~~

When Louise Barteau noted in February 2013 that the production numbers were lower than expected in Fairhaven during testing in October 2012, she brought it to the attention of the MassDEP, which ordered a new round of testing.

As Chris Kapsambelis reviewed the report from the Hoosac Project, he noticed a similar decline in the production numbers.

In contrast, when Kingston residents paid a consultant to test noise from the three “No Fossil Fuel” turbines, the testing was done without the knowledge of the project owners, so there was no opportunity for them to manipulate the results.

The concerns that numerous individuals addressed in their May letter to the MassDEP are justified, with the evidence of these two instances. The letter asks for “independent monitors during data gathering sessions,”  and “determin[ing] the actual production status of the turbine(s) during testing. Some of the testing should be performed unannounced to the turbine operators.”

Yet another case of helping the results to fall on the side of the developers emerged recently in Sheffield VT, where a First Wind project is adversely impacting a family with young children.

According the John Dillon, reporting on August 1, 2013 for Vermont Public Radio, the testing showed a drop-off in production in the middle of a 3-day test. When Dillon asked the lead attorney for the Vermont Department of Public Service, Geoff Commons, about their $20,000 study, he said the results were not definitive.

He said the consultant couldn’t distinguish between the background noise of the wind itself and the turbine sound.  And it was difficult to schedule the monitoring when the wind direction makes the sound worse at the Therriens’ place. Finally, there’s the fact the developer knew the testing was taking place. Commons said that wasn’t part of the plan. He said he doesn’t know if First Wind dialed back the turbines to reduce the sound.

“The possibility certainly does concern me, absolutely. I should say it concerns the department, that that could happen. And going forward we are going to try to control for that in any future testing,” he said.

Source:  Windwise ~ Massachusetts | August 6, 2013 | windwisema.org

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Paypal
(via Paypal)
Donate via Stripe
(via Stripe)

Share:

e-mail X FB LI TG TG Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook

Wind Watch on Linked In Wind Watch on Mastodon