LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Feds approve huge wind facility near Lake Mead 

Credit:  by Chris Clarke | ReWire | July 1, 2013 | www.kcet.org ~~

Interior Secretary Sally Jewell has signed off on a wind power facility that would cover almost 60 square miles of public lands in Arizona near the Lake Mead National Recreation Area. The Mohave County Wind Farm, built by BP Wind Energy North America, would include up to 243 wind turbines with blades about 180 feet long.

The project would occupy 35,329 acres of land under the Bureau of Land Management and 2,781 acres of Bureau of Reclamation land, and would butt up against Lake Mead NRA about 44 miles east of Las Vegas. Depending on the transmission connection eventually chosen, the project would max out at between 425 and 500 megawatts peak generating capacity.

“These are exactly the kind of responsible steps that we need to take to expand homegrown, clean energy on our public lands and cut carbon pollution that affects public health,” said Secretary Jewell. “This wind energy project shows that reducing our carbon pollution can also generate jobs and cut our reliance on foreign oil.”

The one oil-fired power plant in Arizona that this project might have supplanted, the diesel-fueled Grand Canyon Power House in the South Rim area of the National Park, ceased operations in 1956.

According to the Interior Department, the design of the Mohave County Wind Farm was altered significantly due to the presence of eagle nesting areas on nearby Squaw Peak, to the east of the main road leading to the popular Temple Bar Marina on Lake Mead. As a concession to the eagles the redrawn plan includes a nesting zone buffer area at least 1.2 miles wide, a distance it would take an adult eagle at least one minute and 48 seconds to traverse at a typical unhurried soaring speed of 30 miles per hour or so.

“The project reflects exemplary cooperation between our BLM and Bureau of Reclamation and other Federal, state and local agencies, enabling a thorough environmental review and robust mitigation provisions,” said BLM Principal Deputy Director Neil Kornze. “This decision represents a responsible balance between the need for renewable energy and our mandate to protect the public’s natural resources.”

Source:  by Chris Clarke | ReWire | July 1, 2013 | www.kcet.org

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky