[ exact phrase in "" • ~10 sec • results by date ]

[ Google-powered • results by relevance ]

LOCATION/TYPE

News Home
Archive
RSS

Subscribe to RSS feed

Add NWW headlines to your site (click here)

Sign up for daily updates

Keep Wind Watch online and independent!

Donate $10

Donate $5

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Publications & Products

Photos & Graphics

Videos

Allied Groups

Wind turbine to be scrapped  

Credit:  BY HARRY WALSH | Donegal News | May 27, 2013 | donegalnews.com ~~

The huge wind turbine which came crashing down during heavy winds near Ardara eight weeks ago has been taken away to be broken down and scrapped.

Two cranes and a number of lorries spent Wednesday and Thursday of last week on the windfarm at Loughderryduff, near Mass, Portnoo as the 245-foot high turbine was broken down before being transported to Derry.

A spokesman for the developers, North West Wind Ltd, confirmed that the fallen turbine had been removed and all debris had also been cleared.

“The whole site has been cleared. Everything is gone and the landscape has been restored.

“Workers spent most of Wednesday and Thursday on site cutting the turbine into smaller more manageable units which were then lifted by crane onto the back of lorries and taken to Derry to the scrapped and recycled,” Mr John Gilllespie said.

He also confirmed that a technical examination was ongoing and that they were awaiting the outcome of a “technical evaluation” of the scene.

“A preliminary investigation was carried out at the time while further investigations took place at its removal and will form part of the total investigation,” Mr Gillespie said.

The turbine, which has a lifespan of around 25 years, fell just four years after being erected in the eight-unit development.

The turbines at the wind farm have a ‘hub height’ of 49 metres (160 ft) and the 26 m (85 ft) radius of rotor, bringing their total height to 245 foot.

In 2009, the same company was granted planning permission for a further 11 turbines at the site.

These turbines, when erected, will be even bigger that the current ones with a hub height of 55 metres (180 ft).
The additional 26 m (85 foot) radius of rotors will bring the total height to 265 ft.

A spokesman for the Danish manufacturers of the giant wind turbine described such incidents as “very rare.”
Mr Matt Whitby said that Vestas has installed over 47,000 turbines around the world.

The wind turbine which fell near Ardara.

The wind turbine which fell near Ardara.

Source:  BY HARRY WALSH | Donegal News | May 27, 2013 | donegalnews.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

Wind Watch relies entirely
on User Funding
Donate $5 PayPal Donate

Share:


News Watch Home

Get the Facts Follow Wind Watch on Twitter

Wind Watch on Facebook

Share

CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.
Share

Wind Watch on Facebook

Follow Wind Watch on Twitter