NYISO Planning Reports, 2010-2013NYISO Planning Reports, 2010-2013
Capacity (MW) | Generation (GWh) | Cap. Factor | ||||
2010 | 1240 | 2533 | 23.3% | |||
2011 | 1310 | 2787 | 24.3% | |||
2012 | 1363 | 3060 | 25.6% |
Note that these values reflect only available capacity. Considering installed wind turbines that have malfunctioned, burned up, collapsed, or otherwise taken out of operation would significantly lower the total capacity factors.
Of note in the NYISO planning reports is that no addition of wind capacity is planned for past 2014, which has remained consistent for several years:
URL to article: https://www.wind-watch.org/news/2013/04/30/new-york-wind-barely-topped-25-capacity-factor-in-2012/