[ exact phrase in "" • ~10 sec • results by date ]

[ Google-powered • results by relevance ]

LOCATION/TYPE

News Home
Archive
RSS

Subscribe to RSS feed

Add NWW headlines to your site (click here)

Sign up for daily updates

Keep Wind Watch online and independent!

Donate $10

Donate $5

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Publications & Products

Photos & Graphics

Videos

Allied Groups

Lasee’s wind tower siting bill deserves support  

Credit:  Sheboygan Press | April 24, 2013 | www.sheboyganpress.com ~~

The new Wisconsin law PSC 128 ties the hands of local governments and doesn’t allow them to protect the health and safety of the citizens that they represent.

In March, state Sen. Frank Lasee introduced Senate Bill 71. This law would give local governments the ability to adjust industrial wind siting ordinances to protect local residents.The bill has been referred to committee. It’s being held up by committee member Sen. Rick Gudex. He’s leaning against the bill and is standing in the way of moving this bill forward to a vote on the Senate floor.

The proposed Windy Acres project sits between the villages of Adell and Hingham, in a very populated rural area. There are 532 families within one mile of this project. It’s well documented that Industrial Wind Towers (IWTs) adversely affect people when sited too close. Infrasound, low frequency noise and stray voltage, all associated with IWTs, can harm people and affect property values two miles away.

It’s imperative that local governments have to ability to adjust wind siting setbacks to protect their residents. This basic right and responsibility is available in every other state except Wisconsin.

Job creation is a top priority for the state. However, the safety of Wisconsin’s citizens should not be compromised for the sake of a few temporary construction jobs. In fact, ill sited IWTs may actually hamper and stifle growth, creating IWT “wastelands.”

This is a statewide issue, not just a problem for the towns of Holland and Sherman. Other IWT projects are being proposed for the Town of Rhine, the Town of Fredonia in Ozaukee County and the Town of Addison in Washington County. Please contact Sen. Gudex at Sen.Gudex@legis.wisconsin.gov, or call him at (608) 266-5300. Ask him to support SB71. The health and homes of thousands of Wisconsin citizens are at stake.

Mitchell Fisher

Waldo

Source:  Sheboygan Press | April 24, 2013 | www.sheboyganpress.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

Wind Watch relies entirely
on User Funding
Donate $5 PayPal Donate

Share:


News Watch Home

Get the Facts Follow Wind Watch on Twitter

Wind Watch on Facebook

Share

CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.
Share

Wind Watch on Facebook

Follow Wind Watch on Twitter