January 22, 2013
Massachusetts

Wind Turbine report available online

The Bulletin | Jan 21, 2013 | www.wickedlocal.com

FALMOUTH – The 53-page report from the Wind Turbines Options Analysis Process (WTOP) is now available online at the Falmouth town website.

The report was posted just days before the Jan. 23 meeting in which the Falmouth Board of Selectmen will solicit public comments on the wind turbines. The selectmen then hope to vote on language for a warrant article in time for a spring special town meeting. The selectmen must come to a consensus by Feb. 4 in order to so.

To review the WTOP report, go to http://www.falmouthmass.us/energy/wtopreport.pdf.

Look for updates in the Jan. 23 edition of The Bulletin and on Wicked Local Falmouth.


URL to article:  https://www.wind-watch.org/news/2013/01/22/wind-turbine-report-available-online/