LOCATION/TYPE

NEWS HOME



[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]

Archive
RSS

Add NWW headlines to your site (click here)

WHAT TO DO
when your community is targeted

Get weekly updates
RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Sweden-Norway power link project under review by partners 

Credit:  By Torsten Fagerholm | 2012-11-14 | www.bloomberg.com ~~

Svenska Kraftnat and Statnett SF, grid operators in Sweden and Norway, are reviewing the need for an oft-delayed 1,400-megawatt power cable that was planned to boost connections between Oslo and Stockholm.

The cable, proposed in 2008, was originally due to be brought into service as early as 2012. It has since suffered several delays, with the project now up for review by both companies.

“The cable was until recently planned for 2019 although Statnett have now said they’d like an unspecified delay, prompting us in turn to set a completion time frame of 2018 to 2022,” Mikael Odenberg, director general of Svenska Kraftnaet, said today by e-mail.

The southern part of the Nordic power grid between Sweden and Norway is prone to disruptions and frequent transmission bottlenecks. The Sydvaestlaenken project, or South West Link, is intended to boost transmission capacity and smooth out power prices while paving the way for increased wind power output, according to the grid companies.

Existing connections are generally used to ship out cheap hydropower from Norway to neighboring countries, and their operation affects electricity prices in the region, which gets more than half of its power from running water through turbines.

“We are trying to establish a mutual understanding for joint solutions which benefit both countries, and need to review things,” Statnett’s Executive Vice President Gunnar G. Loevas said by e-mail today. A revised view on the project may be presented “within the course of a few months,” he said, declining to comment further.

Statnett is part of a group that plans to build a 1,400- megawatt undersea cable, dubbed NorGer, from Germany to Norway by 2018, followed by a 1,400-megawatt link to the U.K. in 2020.

These plans, which could be more profitable for Norway than the South West Link, may have caused the company’s interest in boosting grids toward Sweden to wane, Odenberg said on Nov. 7 at a conference in Stockholm.

Source:  By Torsten Fagerholm | 2012-11-14 | www.bloomberg.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Contributions
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky