Wind Watch is a registered educational charity, founded in 2005. |
Wind industry upbeat over restoration of accelerated depreciation
Credit: M. Ramesh | Business Line | www.thehindubusinessline.com ~~
Translate: FROM English | TO English
Translate: FROM English | TO English
Chennai, Nov 4:
Since the beginning of the current financial year the wind power industry has had much to despair about. With the removal of both ‘accelerated depreciation’ (AD) and generation-based incentive’ (GBI) the interest level among the investors to put up wind power projects has waned considerably. As a result, the country added only 851 MW of wind power capacity in the first six months of the current year, compared with 1,402 MW in the corresponding period last year.
The tepidity is because of, more than the absence of GBI, the uncertainty regarding the restoration of the incentive – if retored, then no investor would want to lost out the eligibility for an incentive valid for the next, say, 20 years.
The GBI has been promised by the Ministry of New and Renewable Energy in various forums and there is a great expectation about it. Investments into the wind sector are waiting to come in if the generation-based incentive is reinstated.
Be that as it may, a very recent development has brought fresh cheer to the industry—the possibility of reinstatement of the other benefit, viz., accelerated depreciation.
This is said to be due to the efforts of the Indian Wind Power Association. The Association’s Chairman, K Kasturirangan, met the Union Finance Minister, P Chidambaram, a few days back in Coimbatore, to follow up on his own previous presentation to the Ministry of Finance.
“I am confident that the Government will bring back accelerated depreciation,” Kasturirangan told Business Line today. The Indian Wind Power Association has 1,500 members.
Dr K Venkatachalam, Chief Advisor, Tamil Nadu Spinning Mills Association (TASMA) fully shares Kasturirangan’s optimism. Recently, when asked if TASMA members would look at solar power projects with accelerated depreciation in mind, he said that he was confident that AD would be given for wind projects also.
This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.
The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.
Wind Watch relies entirely on User Funding |
(via Stripe) |
(via Paypal) |
Share: