August 7, 2012
Massachusetts

Too big for Route 2

The Recorder | Greenfield, Massachusetts | 6 August 2012

Today, my wife was forced way off road in Charlemont at one of the culvert repairs places. One of those double length trucks hauling wind mill equipment with a police escort, too, right through a construction area. The size of the truck says it would difficult to stop it if necessary There has been one death and one injury this week so far. I sure hope there are no more problems on Route 2.

ALAN BOOTH Charlemont


URL to article:  https://www.wind-watch.org/news/2012/08/07/too-big-for-route-2/