LOCATION/TYPE

NEWS HOME


[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]

Archive
RSS

Add NWW headlines to your site (click here)

WHAT TO DO
when your community is targeted

Get weekly updates
RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Long wait for result in Norfolk turbine case 

Credit:  By Dominic Bareham, Eastern Daily Press, www.edp24.co.uk 3 May 2012 ~~

An action group fighting plans for three wind turbines on a Norfolk airfield could face a long wait to find out the results of a planning inquiry into a decision to refuse the plans.

The 4Villages group is opposed to TCI Renewables’ scheme to install the 126m high turbines at Upper Vaunces Farm near Pulham Market, but a spokesman for the Planning Inspectorate warned the results of last week’s inquiry may not be known for at least seven weeks due to a heavy workload.

Planning inspector Zoe Hill led the three-day inquiry at South Norfolk Council’s offices, which heard the turbines on the land between Rushall, Dickleburgh, Pulham Market and Pulham St Mary could jeopardise the safety of bats and birds, including barn owls and raptors flying to a nearby reservoir which could become fatally entangled in the turbines’ rotor blades.

Jonathan Clay, of 4Villages, cross-examined senior ecologist John Box, of Atkins engineering, who carried out a survey to determine the likely impact of the turbines on the biodiversity of the area.

He asked Mr Box whether birds travelling on a flight path from Rushall to the new agricultural reservoir 500m from the turbines would collide with the blades, to which the ecologist replied the birds could have some “interaction” with the turbine.

Earlier, Mr Box told the inquiry that grass-cutting measures around the new reservoir would prevent the growth of large bushes and trees in which birds could nest and would also mean the turbines could be seen clearly.

However, Mr Clay said there was still a risk birds could be attracted to the reservoir and disputed the level of visibility, asking whether the view would be blocked by an embankment.David Hardy, representing TCI Renewables, said the reservoir was for agricultural purposes and not wildlife.

The applicants say the 9MW turbines would provide renewable power for about 3,500 homes, but the plans were rejected in December.

Source:  By Dominic Bareham, Eastern Daily Press, www.edp24.co.uk 3 May 2012

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Contributions
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky