LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Paypal

Donate via Stripe

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Second developer dumps wind turbine project 

Credit:  By David Patch, Blade Staff Writer, www.toledoblade.com 8 February 2012 ~~

BLISSFIELD – A second developer involved in a wind-turbine project proposed for southern Lenawee County has bailed out.

juwi Wind USA, the Colorado-based domestic subsidiary of a German company, has terminated a study of the 493-foot towers’ potential impact on aviation at Toledo Express Airport, and a company spokesman said Wednesday the reason is that juwi is withdrawing from the area.

“We have terminated the study because we were going to receive a Declaration of Hazard,” said Aaron Peterson, the company’s community relations and regulatory affairs manager. “Because of that and the restrictive zoning in Ogden and Riga townships, we have stopped developing the project.”

The study was undertaken as part of an appeal of the Federal Aviation Administration’s October issuance of a Notice of Presumed Hazard stating that 63 of 80 turbines juwi proposed to be erected in southern Lenawee County were within a 13-nautical-mile radius of Toledo Express and would, if built, intrude into protected air space.

Mr. Peterson’s statement indicated an expectation that the FAA would deny the appeal. The FAA confirmed that the studies for 63 wind turbines had been voluntarily canceled by juwi Wind but did not elaborate.

Last month, Consumers Energy filed regulatory documents seeking regulatory permission to amend a power-purchase agreement with Blissfield Wind, a joint venture of Exelon Wind and Great Lakes Wind LLC to allow the latter to build turbines in two counties north and northwest of Lansing instead of Lenawee.

A spokesman for Exelon Power, Exelon Wind’s corporate parent, said township zoning regulations “effectively precluded development” of the 45 turbines Blissfield Wind had proposed.

Riga last year adopted property-line setback and noise rules that the wind developers contended would make their projects unworkable. Ogden, which has no zoning, imposed a wind-farm moratorium while its officials considered similar rules for wind turbines.

Joshua Nolan, a director of the Interstate Informed Citizens Coalition, a group that opposed the wind project as proposed, said the “news that air travelers and local residents will be safe from the dangers of improperly sited industrial wind turbines” was welcomed.

“However, we must express our frustration at the needless harm that was imposed upon the region’s social fabric by this divisive issue,” Mr. Nolan said. “Neighbors, even family members, no longer speak to each other as a result of their disagreement about a wind-turbine project that could never have been built in the first place.”

The turbine controversy – pitting residents eager to cash in on turbine-site leases against those wary of noise and “shadow flicker” from spinning turbine blades – led to recall elections that unseated Ogden Township Supervisor James Goetz and Clerk Phyliss Gentz. Jefferee Simon, the Riga Township supervisor, narrowly survived a recall vote.

Source:  By David Patch, Blade Staff Writer, www.toledoblade.com 8 February 2012

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Paypal
(via Paypal)
Donate via Stripe
(via Stripe)

Share:

e-mail X FB LI TG TG Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook

Wind Watch on Linked In Wind Watch on Mastodon