Wind Watch is a registered educational charity, founded in 2005. |
Papers filed for Palmyra Township wind turbine referendum
Credit: By David Frownfelder, Daily Telegram, www.lenconnect.com 9 December 2011 ~~
Translate: FROM English | TO English
Translate: FROM English | TO English
PALMYRA TWP., Mich. – Backers of a petition drive to force a referendum vote in Palmyra Township turned in their petitions on Wednesday, township clerk Samantha Meyer said this morning. If confirmed, a vote on a wind turbine ordinance would be set on the next available election day.
Josh Nolan, a director of the Interstate Informed Citizens Coalition (IICC), said the petitions contained signatures of 238 registered Palmyra Township voters. He said 110 signatures were required to force a vote.
“As many of you are aware, the IICC has helped coordinate the passing of petitions in Palmyra Township to place the industrial wind turbine zoning ordinance recently enacted by the Palmyra Township Board up for referendum,” Nolan wrote in an email. “The IICC and numerous Palmyra residents believe that the setbacks and sound limits contained in that ordinance provide insufficient protection from the dangers of irresponsibly sited industrial wind turbines.”
County clerk Roxann Holloway said once the signatures have been confirmed, Meyer will contact the county about an election date. The first available date would be May 8, she said. The deadline to make the February election date passed Wednesday.
If the referendum reaches the ballot, the vote would determine the fate of a wind turbine ordinance approved by the township board in October. The ordinance would require a setback from non-participating properties of no less than twice the height of the turbine. The maximum noise level of 45 decibels would be measured from any inhabitable building on a non-participating property.
A vote upholding a more stringent ordinance in Riga Township was passed Nov. 8. The Ogden Township board is working on an ordinance governing wind turbines in that township.
Officials from Great Lakes LLC, one of the groups seeking to place wind turbines in Lenawee County, said the Riga vote ended the company’s interest in building there. Projects are still planned for Palmyra and Ogden townships, said Doug Duimering, a project manager with Exelon Wind, one of the project partners.
This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.
The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.
Wind Watch relies entirely on User Contributions |
(via Stripe) |
(via Paypal) |
Share: