LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Howard approves extra cost for two wind turbines 

Credit:  By Angela Sutfin, The Evening Tribune, www.eveningtribune.com 15 September 2011 ~~

The Town of Howard met Wednesday and discussed the extra cost of adding two turbines.

The board approved an adjustment to the Environmental Monitoring Services Budget for extra time spent by Labella Associates PC engineers to assess the work to be done adding the last two turbines.

The budget was revised from $126,940 to $180,700 for the entire contract with Everpower. The budget increase comes after the town decided to add two additional turbines, which meant Labella engineers put in more hours assessing the environmental impact study required by Everpower.

Everpower agreed to cover the cost of the engineers and will absorb the budget difference approved by the board in last night’s meeting.

The two turbines were approved by the planning board to be installed on Spencer Hill Road, but a timetable for their installation is not yet determined.

LaBella Associates engineers were hired by the town to assess the construction and impact of the turbines, including all 25 that are currently installed.

In other news, the board:
• Heard a request from Burton Weldy, board president of the Howard Public Library, for $5,000 to supplement the cost of a second-floor emergency exit that must be installed according to state regulations

• Heard an announcement that the Howard Public library now offers free public wifi access

• Approved a bid for a John Deere grader and snow equipment from Five Star in Rochester for a total cost of $243,740

• Announced a meeting to plan next year’s town budget for Thursday, Sept. 29 at 6 p.m.

Source:  By Angela Sutfin, The Evening Tribune, www.eveningtribune.com 15 September 2011

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky