LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Paypal

Donate via Stripe

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Wawasee considers middle school wind turbine 

Credit:  Jordan Fouts, Times-Union Correspondent, www.timesuniononline.com 7 September 2011 ~~

SYRACUSE – A dozen community members will help decide if wind power is right for the Wawasee School Corp.

Including residents, business leaders and students from the district all invited by school board members, the Wind Turbine Study Committee first met Tuesday at the high school. They heard from the planners and engineers who already pitched to the school board the idea of installing a wind turbine at Wawasee Middle School.

“No one on the school board is dead-set for or against it,” Schools Superintendent Tom Edington told committee members. “Right now we want to learn and study, study and learn.”

He added that Wawasee currently spends about $1 million every year in energy costs, which is why they have been looking at making buildings more energy efficient and exploring homegrown power options. Wind speed and available space at the middle school make a wind turbine a viable prospect.

The 230-foot-tall, 900,000 kW turbine would be installed at the southwest corner of the property, according to initial plans. It could generate not only power but also income for the district through a renewable energy credit deal with Nipsco, said Tony Kuykendall with Perfomance Services Inc.

Nipsco began offering a “feed-in” tariff in July, effectively buying power from renewable energy producers. Wawasee officials applied to the 15-year program, which has a limit of 30 mW worth of participant energy producers, but haven’t learned yet if they can claim one of the last few spots.

Performance Services is overseeing a similar project at Tippecanoe Valley School Corp., where turbine components were received Tuesday afternoon. The total cost for that project is $2.63 million, and similar costs are expected at Wawasee.

Generating $164,000 worth of current every year, the turbine would produce $5.2 million in income for the corporation by the end of its 25-year expected lifespan, and pay for itself after 14 years, Kuykendall said. Exact figures depend on how Wawasee structures payment for construction and ongoing maintenance.

Edington noted that maintenance could be paid from the capital projects fund while Nipsco payments received into the general fund, meaning “you could literally use it to pay for education.”

Kuykendall acknowledged that Nipsco would not pay during downtime, when power is not produced, but said the turbine should be running three-fourths of the time during high winds in September through May and one-third of the time in summer.

Besides answering committee members’ questions, school officials said numerous studies will have to be done – including bird migration patterns and turbine noise and vibration – and issues resolved such as zoning and effects on neighbors as they explore the wind power option for Wawasee.

The committee is scheduled to meet again Sept. 20 at 5 p.m. at the middle school.

Source:  Jordan Fouts, Times-Union Correspondent, www.timesuniononline.com 7 September 2011

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Paypal
(via Paypal)
Donate via Stripe
(via Stripe)

Share:

e-mail X FB LI TG TG Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook

Wind Watch on Linked In Wind Watch on Mastodon