LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Turbine project awaits hearing 

Credit:  Written by Kimberly Gasuras, Telegraph-Forum, www.bucyrustelegraphforum.com 6 August 2011 ~~

SANDUSKY TOWNSHIP – A massive wind energy project that will encompass 46,000 acres in rural Richland and Crawford counties is poised for a decision.

Next up is a public hearing regarding the proposed project at 6 p.m. on Sept. 15 at Shelby Senior High School, 109 W. Smiley Ave., Shelby.

“After that the staff of the Ohio Power Siting Board will make their decision on whether or not the project can move forward,” said Element Power senior project manager Scott Hawken.

In Richland County the wind turbines would be located near Shelby. They would be found in portions of Sandusky Township in Crawford County.

“Our priority in all of this is to maintain and protect the public infrastructure,” said Crawford County Commissioner Doug Weisenauer.

While some residents in the area are opposed to the project, citing noise as one of their concerns, Hawken has said the turbines sound similar to a compressor on a refrigerator.

“You can hold a conversation at the base and not have any problem hearing,” Hawken said.

“The Ohio Power Siting Board mandates the allowable decibel level, and we must adhere to their standards,” Hawken said previously.”

The project will produce up to 200 megawatts of energy.

Hawken said there are about 150 property owners who have signed on to be part of the project, but there are a few who still have reservations.

“Another issue was the condition of the roads in the area. We are drafting a road agreement with the townships and both Richland and Crawford counties to beef up the roads before the project and to fix them after construction is over,” Hawken said.

“We’ve tried to develop the project to minimize any negative impacts on the residents and have exceeded the state set-back requirements by being 1,250 feet away from property owners.”

Hawken said the state set-back requirement is about 950 feet.

Source:  Written by Kimberly Gasuras, Telegraph-Forum, www.bucyrustelegraphforum.com 6 August 2011

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky