LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]



Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Wind generates frustration 

Credit:  The Inter-Mountain, theintermountain.com 2 July 2011 ~~

I read, with interest, the article in Monday, June 20’s The Inter-Mountain, “Windmills starting to spin”… I was particularly pleased to read that there will be an open house in the fall and I hope they will let us “wind energy detractors” attend as well.

It is important for Randolph and Barbour County residents to get a close-up look at the destruction and ridge reconfiguring that took place to gouge out the roadways necessary for the long and heavy loads of tower sections and blades. I have seen the entire length of the project and it is a sad sight.

In the final line of The Inter-Mountain article, the wind project’s general manager says that, “The power (generated on Laurel Mountain) is expected to add to the overall stability of the regional grid.” While we might expect some hyperbole from a wind spokesman, this statement goes beyond expected exaggeration. In a good year, wind fueled electrical generation is lucky to reach 30 percent of the capability of its equipment and Laurel Mountain is not a prime location for wind. Add to this the fact that wind turbines begin to show signs of wear after only a few years of service. It’s not unusual to observe 5 percent or more turbines out of operation in relatively new wind farms.

We understand energy in West Virginia. What if 70 percent of a truck load of coal would not burn and the power plant had to sort through the load to get rid of the clunkers? It would not add stability. Neither will the fluctuating nature of expensive, wind fueled electricity which varies in intensity with changes in wind speed, and disappears entirely for days at a time in certain seasons of the year. It would appear that AES and their Chinese partner, China Investment, are not here to generate a stabile supply of electricity, but rather to collect our U.S. tax dollars through credits and government handouts.

John Terry

Montrose

Source:  The Inter-Mountain, theintermountain.com 2 July 2011

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky