LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

FAA and CPUC find SDG&E replacement helicopter "capable of operating safely" 

Credit:  East County Magazine, eastcountymagazine.org 27 June 2011 ~~

The California Public Utilities Commission (CPUC) today issued an update to its preliminary incident report on two 16,000 pound Sunrise Powerlink towers dropped by an air crane earlier this month.

According to the updated report, a new air crane has been provided by the manufacturer, Erickson. The new helicopter has undergone test transporting and lifting heavy loads, and has now been approved to resume construction activities in East County.

The two incidents occurred June 7 and June 10 in Imperial County, though the massive air crane is also utilized on Powerlink Construction in San Diego’s East County.

The revised report faults a hook system for releasing prematurely. The replacement helicopter is a 64-F model air crane similar to the one previously used by SDG&E, but has an older lower hook release system than the prior helicopter. “This particular helicopter has conducted over 280,000 lifts,” the CPUC revised report states.

The Federal Aviation Administration (FAA) has also approved Congested Area Plans (CAPs) submitted by SDG&E following the incidents and reviewed a copy of the flight test plan to validate the cargo hook on the replacement aircraft N158AC. FAA inspectors observed the tests and approved resumption of operational lifts.

The CAPs require, an additional to adherence to federal aviation regulations and CAPs, that SDG&E hold an on-site safety meeting prior to lifts. SDG&E has added a new safety position, the CPUC reports. Traffic control permits and safety measures are also to be implemented to ensure public safety on traveled routes during lift operations.

In response to regulatory inquiries, SDG&E also submitted documentation that the eight pilots have each logged total flight hours ranging from 3,250 to 31,485.

Source:  East County Magazine, eastcountymagazine.org 27 June 2011

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky