[ exact phrase in "" • ~10 sec • results by date ]

[ Google-powered • results by relevance ]

LOCATION/TYPE

News Home
Archive
RSS

Subscribe to RSS feed

Add NWW headlines to your site (click here)

Sign up for daily updates

Keep Wind Watch online and independent!

Donate $10

Donate $5

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Publications & Products

Photos & Graphics

Videos

Allied Groups

Turbine collapse probe completed  

Credit:  By NANCY MADSEN, TIMES STAFF WRITER, Watertown Daily Times, www.watertowndailytimes.com 15 October 2010 ~~

The state Public Service Commission decided Thursday that Noble Environmental Power LLC has strong maintenance and inspection policies at Altona Wind Farm, closing its investigation into a turbine collapse.

The commission investigated the wind farm after one turbine collapsed and another was damaged March 6, 2009, at the project in Clinton County. Noble, the largest wind developer in the state, operates several projects with 612 megawatts of installed capacity and 216 in development.

Noble now has stronger site control documentation and record-keeping on each individual turbine, a PSC spokesman said.

PSC staff concluded in May that the collapse of the turbine and failure of a second at the 65-turbine Altona project were a result of incorrect wire installation. That prevented the turbines from going into an automatic shutdown mode when they lost power.

But Thursday, after independent reviews of Noble’s records, management protocols, operations and maintenance procedures and site conditions, the commission decided Noble was in compliance with appropriate specifications and procedures.

“The Commission is encouraged by the steps that Noble has taken to implement robust site control and internal reporting and scheduling procedures subsequent to the Altona turbine failure investigation,” Chairman Garry Brown said in a news release.

Noble has responded to a commission order to show cause, stating its affiliates were complying with all quality assurance and quality control measures and manufacturer’s recommendations.

Meanwhile, in response to the turbine failure incident, General Electric Co., which manufactures the involved turbines, has implemented remote testing procedures to preclude a repetition of the circumstances that led to the incident.

The full decision will be available soon on the commission’s website.

ON THE NET

Public Service Commission: www.dps.state.ny.us

Source:  By NANCY MADSEN, TIMES STAFF WRITER, Watertown Daily Times, www.watertowndailytimes.com 15 October 2010

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

Wind Watch relies entirely
on User Funding
Donate $5 PayPal Donate

Share:


News Watch Home

Get the Facts Follow Wind Watch on Twitter

Wind Watch on Facebook

Share

CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.
Share

Wind Watch on Facebook

Follow Wind Watch on Twitter