LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Thanet Offshore Wind Farm gearbox faults ‘solved’ 

Credit:  bbc.co.uk ~~

Vattenfall turbine Vattenfall said problems with turbine gearboxes had been overcome

Gearbox problems which have plagued offshore wind turbines have been solved, a Swedish energy company has said.

Vattenfall already owns the 30-turbine Kentish Flats wind farm and is about to finish installing the 100-turbine Thanet Offshore Wind Farm off Kent.

At the Kentish Flats, turbines have had serious maintenance problems and some are on their fourth gearbox.

A spokesman for Vattenfall said problems had been overcome.

He said: “We have had several discussions with Vestas, our wind turbine supplier, but we believe the problems that we have had at the Kentish flats have been overcome out here.”

Independent energy consultant John Large said: “The technical problems are this; you have a long stalk called the mast, you have about 150 or 200 tonnes sitting on top of it with a great rotor that’s vibrating and pulsing and fluttering.

“Now all of that has to be transmitted into a gearbox and then produced into electricity via a generator, and it’s the design of the gearbox that’s given tremendous problems.”
Largest wind farm

The Thanet Offshore Wind Farm is expected to generate enough electricity for 240,000 homes.

It supplied power to the National Grid for the first time on 16 May and is expected to be fully operational in the autumn.

Construction started a year ago at the £780m wind farm, which can be seen from the coast on a clear day.

The Kentish Flats wind farm, off Herne Bay, was one of the UK’s first such projects when it opened five years ago.

The Thanet Offshore Wind Farm is currently the world’s biggest wind farm. But the larger London Array project, which will have 341 turbines in the Thames Estuary and is backed by energy firm E.ON as a major backer, will enter its offshore construction phase next year.

Source:  bbc.co.uk

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky