Let us stick to the facts on using wind turbines
Translate: FROM English | TO English
Translate: FROM English | TO English
I was interested to read the report about job creation from windfarms.
Energy Minister Malcolm Wicks reiterates all the junk science and misinformation concerning this subject.Let us stick to facts. More than 5,000 two-megawatt wind turbines would be needed to match the output of Drax power station alone.
More than 30,000 of the monstrous three-megawatt turbines would be needed to meet our ill-advised EU ‘renewable’ targets. No conventional power plants could be decommissioned because they are needed as back-up.
Take note of the failed German and Danish experiments.
What we are facing is the biggest desecration of the landscape since the industrial revolution, the biggest potential taxpayer subsidies for foreign-owned and manufactured machines and an unprecedented increase in energy costs based on EU-sponsored, greeny box-ticking nonsense.
Godfrey Bloom
UKIP MEP for Yorkshire and North Lincolnshire.
29 July 2008
This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.
The copyright of this article resides with the author or publisher indicated. As part of its noncommercial effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.
Wind Watch relies entirely on User Funding |
![]() |
![]() |
Share: