LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Paypal

Donate via Stripe

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Wind farm test mast approved 

A wind farm company has been given approval to put up a test mast in Craven.

Temporary three-year permission was given for the 200ft (60m) meteorological mast at the site at Brightenber Hill, close to East Marton.

On Monday, Craven District Council’s planning committee heard that the steel mast, supported by guy wires, was needed to test wind conditions and would be used to determine the type of wind turbines to be used at the site. At their meeting last month, councillors argued that the test mast was premature because an application for a wind farm had not been submitted – although one was expected shortly.

But they were reminded all planning applications should be determined on their own merit and the temporary structure was felt to have limited impact on the surrounding countryside.

Councillors, who visited the site before this week’s meeting, also heard from Christopher Emmett, of the newly formed Friends of Craven Landscape.

He argued that the mast would look out of place in the open countryside.

Chris Ganey, from German-owned applicants EnergieKontor, said that the mast was needed for a minimum of 12 months to gain data. “We need to make sure that we choose the right type of wind turbine, should wind turbines be built on this site,” he said.

Coun David Heather said the mast would be totally out of character with its surroundings.

“On bright days, the light will catch it and it will be even more visible,” he said.

Coun Paul Whitaker said that the mast would give a good indication of the height of the expected wind turbines.

EnergieKontor is expected to shortly submit an application for five wind turbines at the site.

Craven Herald & Pioneer

11 April 2008

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Paypal
(via Paypal)
Donate via Stripe
(via Stripe)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky