[ exact phrase in "" • ~10 sec • results by date ]

[ Google-powered • results by relevance ]


LOCATION/TYPE

News Home
Archive
RSS

Subscribe to RSS feed

Add NWW headlines to your site (click here)

Sign up for daily updates

Keep Wind Watch online and independent!

Donate $10

Donate $5

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Publications & Products

Photos & Graphics

Videos

Allied Groups

Md. sets hearing on wind power in Garrett Co.  

The state Public Service Commission has scheduled a hearing March 6 in McHenry on the proposed downsizing of a Garrett County wind power project.

The change would shrink the project originally proposed by California-based Clipper Windpower from 40 turbines with a maximum output of 101 megawatts to 28 turbines generating up to 70 megawatts.

Under a state law passed last year, the project would then be small enough to avoid some of the public scrutiny that proponents say has hampered wind energy development in the state.

Two such projects were approved in 2003 but none has been built.

Opponents of wind turbine construction in the western Maryland mountains are questioning the legality of the proposed change.

Associated Press

wjz.com

19 February 2008

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

Wind Watch relies entirely
on User Funding
Donate $5 PayPal Donate

Share:


News Watch Home

Get the Facts Follow Wind Watch on Twitter

Wind Watch on Facebook

Share

CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.
Share

Wind Watch on Facebook

Follow Wind Watch on Twitter