Wind Watch is a registered educational charity, founded in 2005. |
Md. sets hearing on wind power in Garrett Co.
Translate: FROM English | TO English
Translate: FROM English | TO English
The state Public Service Commission has scheduled a hearing March 6 in McHenry on the proposed downsizing of a Garrett County wind power project.
The change would shrink the project originally proposed by California-based Clipper Windpower from 40 turbines with a maximum output of 101 megawatts to 28 turbines generating up to 70 megawatts.
Under a state law passed last year, the project would then be small enough to avoid some of the public scrutiny that proponents say has hampered wind energy development in the state.
Two such projects were approved in 2003 but none has been built.
Opponents of wind turbine construction in the western Maryland mountains are questioning the legality of the proposed change.
Associated Press
19 February 2008
This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.
The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.
Wind Watch relies entirely on User Contributions |
(via Stripe) |
(via Paypal) |
Share: