October 6, 2007
Wales

Mast assurances

A 70-metre mast to measure wind speed on top of Mynydd Penyfan does not imply that huge energy generating turbines will follow, says a report.

Newport-based Gamesa Energy Ltd is planning to put the temporary mast on the mountain.

The report states: “The proposed mast, while being 70m high is a slim structure located in an isolated countryside location.”

by Jean Parry, South Wales Echo

icwales.icnetwork.co.uk

6 October 2007


URL to article:  https://www.wind-watch.org/news/2007/10/06/mast-assurances/