Wind Watch is a registered educational charity, founded in 2005. |
Wind turbine issue still turning for reeve
Translate: FROM English | TO English
Translate: FROM English | TO English
Ashfield-Colborne-Wawanosh reeve Ben Van Diepenbeek says a meeting with the environment minister last week was a little disappointing.
Van Diepenbeek says his council was looking for direction in establishing wind turbine setbacks for Epcors Kingsbridge two project.
Van Diepenbeek says they were told the province does have setback requirements and they would fax them to the municipality.
But Van Diepenbeek says they didn’t get any specific information out of the meeting with the minister.
This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.
The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.
Wind Watch relies entirely on User Contributions |
(via Stripe) |
(via Paypal) |
Share: