[ exact phrase in "" • ~10 sec • results by date ]

[ Google-powered • results by relevance ]


LOCATION/TYPE

News Home
Archive
RSS

Subscribe to RSS feed

Add NWW headlines to your site (click here)

Sign up for daily updates

Keep Wind Watch online and independent!

Donate $10

Donate $5

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Publications & Products

Photos & Graphics

Videos

Allied Groups

Wind turbine ready for sea trip  

http://news.bbc.co.uk/

The first of two of the world’s biggest offshore wind turbines is expected to leave a former Highlands oil fabrication yard on Sunday.

The tower and its components will be floated from Nigg, Invergordon, to the Beatrice Field in the Moray Firth.

A Scottish-based consortium led by oil firm Talisman and Scottish and Southern Energy (SSE) will test the deepwater turbines in a £35m pilot.

If successful, a full 200-turbine wind farm will be built 12 miles offshore.

The turbines will be tested in depths of about 45m, with the hubs rising to 88m above sea level. The blades will be 63m long.

It is hoped the site will be capable of generating one Gigawatt of electricity, enough renewable energy to power the city of Aberdeen.

European Energy Commissioner Andris Piebalgs inspected the turbines at Nigg in July.

Government funding was secured two years ago, with £3m from the Scottish Executive and £3m from the Department of Trade and Industry.

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

Wind Watch relies entirely
on User Funding
Donate $5 PayPal Donate

Share:


News Watch Home

Get the Facts Follow Wind Watch on Twitter

Wind Watch on Facebook

Share

CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.
Share

Wind Watch on Facebook

Follow Wind Watch on Twitter