Wind farm lease and easement agreement – Crowned Ridge Wind Energy Center, S. Dak. 

Author:  | Contracts, South Dakota

1. Parties. This Wind Farm Lease and Easement Agreement (“Agreement”) is -made and entered as of the ____ day of ____________, 2013 (“Effective Date”), by and between ____________________, ____________________ (collectively, the “Owner”) and Crowned Ridge Wind Energy Center, LLC, a Delaware limited liability company, (“Operator”) an affiliate of NextEra Energy Resources, LLC, a Delaware limited liability company. …

2. Project. This Agreement relates to the wind-powered electrical power generation and transmission project known as the “Crowned Ridge Wind Energy Center” to be located in Codington County and Deuel County, South Dakota (“Wind Farm”), which may be wholly or partially located on the Owner’s property legally described on the attached Exhibit A-1 to this Agreement (“Owner’s Property”). Upon Operator’s exercise of the Option (as defined below), the Wind Farm shall include (i) the Leases referenced in Section 4 that are located on the Owner’s Property; (ii) the Easements granted in Section 5, and (iii) the Improvements to be constructed on Owner’s Property referenced in Section 8. The Leases, Easements and Improvements are sometimes collectively referred to as the “Operator Property.” …

3.3 Use of Owner’s Property. During the Option Term, Operator and its employees, agents and contractors shall have a non-exclusive right to enter upon the Owner’s Property and the right of ingress and egress over and across the Owner’s Property for the purposes of (i) surveying the Owner’s Property; (ii) performing such other tests and studies as Operator may desire in connection with the Option, including, without limitation, environmental, avian and cultural resource assessments, threatened or endangered species assessments, and geotechnical, foundation and soil tests; provided that such activities do not unreasonably interfere with Owner’s use of the Owner’s Property as set out in Section 11.3; and (iii) installing, maintaining, operating, inspecting and removing one or more wind monitoring devices and all associated activities (including the Met Towers referenced in Section 8.3), and including the performance of all tests and studies associated therewith. Owner shall not permit any other individual or entity except Operator or its affiliates to install a Met Tower on Owner’s Property. …

4.1 Construction Right. (a) Owner grants Operator rights for purposes of constructing, operating, maintaining, repairing, replacing, and removing all or any part or component of the Improvements whether located on or off Owner’s Property. This construction right is referred to as the “Construction Right” and the property subject to the burden of this Construction Right is referred to as the “Construction Property.” Operator may exercise its right to use all or any part of the Construction Property as and when Operator deems it necessary or advisable to do so to perform the activities for which this Construction Right is granted, including, without limitation, constructing, operating, maintaining, repairing, replacing, and removing laydown areas, staging areas, crane pads and parking for Operator’s employees. After each use of the Construction Right, Operator to the extent reasonably possible shall restore the Construction Property to the condition it was in before Operator’s use.

(b) When installing, maintaining or removing the nacelle and rotor from any Turbine, whether located on or off of Owner’s Property, this Construction Right also shall permit Operator to: (1) (for the purpose of securing tag lines) travel on foot or in a pickup truck, SUV, small forklift or other similar vehicles onto Owner’s Property up to seven hundred (700) feet in any direction from the center of the Construction Property; and (2) drive an erection crane on Owner’s Property and make use of earthmoving equipment for purposes of building suitable access routes for such crane. Operator shall be permitted to maintain a 120 foot by 40 foot crane pad at each Turbine Site Property (hereinafter defined) on Owner’s Property for purposes of constructing and maintaining the Wind Farm.

4.2 Access Right. (a) Owner grants Operator the right of access over the Owner’s Property for unobstructed vehicular, equipment and pedestrian ingress to and egress from the Improvements, the Construction Property, the Turbine Site Property, the Collection Property, the Overhang Property, and the Met Tower Property, whether located on or off Owner’s Property. This right of access is referred to as the “Access Right” and the property subject to the burden of this access right is referred to as the “Access Property.” Operator shall have the right to travel over, across and along the Access Property by means of existing roads and lanes, and by roads Operator or Owner may construct or improve from time to time on, over, and across the Owner’s Property.
(b) Owner reserves the right to use all roads on the Access Property provided, however, that Owner shall not and shall not permit others to obstruct or damage the roads or in any other way interfere with Operator’s rights under this Access Right.

4.3 Turbine Site Lease. Owner grants Operator a lease to construct, operate, replace, relocate, remove, and maintain a Turbine, Collection Facilities, together with associated roads and parking areas on Owner’s Property. This grant is referred to as the “Turbine Site Lease” and each Turbine site so leased is referred to as a “Turbine Site Property.”

4.4 Collection Lease. Owner grants Operator a lease for the construction, operation, maintenance, replacement, relocation or removal of Collection Facilities on and under the Owner’s Property. This grant is referred to as the “Collection Lease” and the property so leased is referred to as the “Collection Property.”

4.5 Telecommunication Facilities Lease. Operator leases Owner’s Property for Operator to construct, operate, maintain, replace, relocate or remove Telecommunication Facilities (hereinafter defined) on, over, across, along and under the Owner’s Property.

4.6 Overhang Right. Owner grants Operator the right and privilege to permit the rotors of Turbines located on adjacent properties to overhang a portion of the Owner’s Property. This right is referred to as the “Overhang Right” and the property subject to the Overhang Right is referred to as the “Overhang Property”. Owner shall not interfere with the operation of Turbine rotors that overhang the Overhang Property.

4.7 Met Tower Lease. Owner grants Operator a lease to construct, operate, replace, relocate, remove, and maintain a Met Tower and Collection Facilities on Owner’s Property. This grant is referred to as the “Met Tower Lease” and each Met Tower site so leased is referred to as a “Met Tower Property.”

5. Easements. Upon the exercise of the Option by Operator, Owner grants to Operator, and Operator accepts from Owner, for the Lease and Easement Term referenced in Section 6.1, the following easements over and across the Owner’s Property in accordance with the terms and conditions of this Agreement. The following easements are for the benefit of Operator and Operator’s agents, contractors and employees, are located on the Owner’s Property and are collectively referred to as the “Easements.”

5.1 Wind Non-Obstruction Easement. (a) Owner grants Operator an irrevocable, exclusive easement for the right and privilege to use, maintain and capture the free and unobstructed flow of wind currents over and across the Owner’s Property (“Wind Non- Obstruction Easement”). Along with the Option Notice, Operator shall deliver to Owner the following legal descriptions which shall become Exhibit A-2 of this Agreement: (a) a description of the Wind Non-Obstruction Easement property subject to this Agreement; (b) a description Of the Wind Non-Obstruction Easement in vertical and horizontal angles; and (c) a description of real property benefiting from the Wind Non-Obstruction Easement. Owner shall not engage in any activity on Owner’s Property that might interfere with wind speed or wind direction over any portion of any Turbine or Met Tower Easement Properties, whether located on or off the Owner’s Property; cause a decrease in the output or efficiency of any Turbine or accuracy of any meteorological equipment; or otherwise interfere with Operator’s operation of the Wind Farm or exercise of any rights or the Leases granted in this Agreement (“Interference”). Owner reserves the right to erect structures on Owner’s Property in compliance with all applicable laws and ordinances except as specifically limited in this Agreement. Owner must consult with and obtain Operator’s prior written approval as to the location of all structures greater than forty (40) feet in height located one thousand (1000) feet or less from any Turbine or Met Tower. Approval shall be based on whether, in Operator’s sole judgment, informed by appropriate professional engineering and meteorological opinions; the proposed structures at the proposed location are likely to cause Interference.

(b) This grant of easement of the Wind Non-Obstruction Easement expressly includes the right of Operator to enter on any part of Owner’s Property to enforce Operator’s rights, including the physical removal of trees or structures (except existing trees and structures) causing Interference to the project contemplated by Operator. Operator shall consult with Owner before making any such removals.

5.2 Effects Easement. Owner grants to Operator a non-exclusive easement for audio, visual, view, light, flicker, noise, shadow, vibration, air turbulence, wake, electromagnetic, electrical and radio frequency interference, and any other effects attributable to the Wind Farm or activity located on the Owner’s Property or on adjacent properties over and across the Owner’s Property (“Effects Easement”). …

Download original document: “Wind farm lease and easement agreement – Crowned Ridge Wind Energy Center, S. Dak.

This material is the work of the author(s) indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this material resides with the author(s). As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Queries e-mail.

Wind Watch relies entirely
on User Contributions
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky