The request to modify the Capital II wind farm by increasing rotor blade length should be rejected on at least three grounds: noise impact; visual impact; and impact on avifauna. The proposal is misleading and/or totally inadequate in its advice about the effect of the proposal on each of those aspects.

Download original document: “Overwhelming Grounds for Rejecting Requested Modification 2 for Proposed Capital II Wind Farm [1]