[ exact phrase in "" ]

[ including uploaded files ]

ISSUES/LOCATIONS

List all documents, ordered…

By Title

By Author

View PDF, DOC, PPT, and XLS files on line
Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

RSS

Add NWW documents to your site (click here)

Wind Watch is a registered educational charity, founded in 2005.

Meredith, N.Y. wind energy law 

Author:  | New York, Ordinances

Article 300. COMMERCIAL WIND ENERGY FACILITIES

Section 303. Physical Standards for Wind Energy Facilities. A.

14. No shadow flicker shall be permitted on any off-site residence.

15. The maximum total height of an individual WECS can be no more than 400 feet.

17. The statistical sound pressure level generated by a WECS shall not exceed the ambient decibel level, both A-weighted and C-weighted, plus 5 decibels measured anywhere along the site boundary. Sites can include more than one piece of property and this requirement shall apply to the combined properties. Ambient sound level measurements shall employ all practical means to reduce or compensate for the effect of wind generated noise artifacts at the microphone so as to measure the actual sound level most accurately. Ambient sound level measurements should be performed when wind velocities aloft are sufficient to allow wind turbine operation and should report ambient sound levels for wind speeds aloft corresponding to turbine cut-in as well as the wind speed aloft corresponding to production of the greatest noise. The sound pressure level at off-site residences shall not exceed ambient sound plus 5 decibels, both A-weighted and Cweighted, as determined in accordance with the stipulations of Section 301 (A)(14)(d) of this local law. Independent verification by an acoustical engineer certified with the Institute of Noise Control Engineering shall be provided before and after construction to demonstrate compliance with this requirement.

19. Any work associated with the construction of a Commercial Wind Energy Facility shall not negatively affect groundwater quality or quantity of residential wells within two (2) miles of the facility boundary.

21. No shadow spill shall be permitted on any off-site property.

22. No ice throw shall be permitted off the site of any WECS.

Section 306. Setbacks

Each WECS shall be set back:

A. A minimum of two and one-half times the Total Height of the largest proposed WECS from the nearest Site boundary line or public road.

Download original document: “Meredith wind energy law

This material is the work of the author(s) indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this material resides with the author(s). As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Queries e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky