July 10, 2014
Noise

Interim Report for Kingston Wind Turbine Acoustical Study

Mass. Department of Environmental Protection

β€œThe monitoring data shows exceedences on March 2, 2014 (Scenario #2) and March 15, 2014 (Scenario #3), both at the 13 Schofield Road monitoring location. The exceedences occurred with winds from the South and Southwest at moderate and high speeds of 8 to 10.3 meters/second at hub height. On March 2, 2014, the data collected indicates that there was a 15 dBA difference between the L90 Background and the LMax sound from the KWI wind turbine. On March 15, 2014, the data collected indicates that there was a 13.7 dBA difference between the L90 background and the LMax sound from the KWI wind turbine.”

Download original document: β€œInterim Report for Kingston Wind Independence Turbine Acoustical Study [1]”


URL to article:  https://www.wind-watch.org/documents/interim-report-for-kingston-wind-turbine-acoustical-study/


URLs in this post:

[1] Interim Report for Kingston Wind Independence Turbine Acoustical Study: https://docs.wind-watch.org/Kingston-noise-MassDEP-interim-report-2014.pdf