Electricity Output from the Maple Ridge Windplant July, August, September 2006
Translate: FROM English | TO English
Translate: FROM English | TO English
“Maple Ridge has a nameplate capacity factor of 240 MW, but from the graph we see that for 40% of the quarter [July, August, September 2006] (1883 hrs), the wind farm produced a paltry 0-30 MW, or 0-12.5% of nameplate capacity. At no time did the output sustain full 240 MW. Indeed, the output was only above half the rated output 15% of the time.”
Download original document: “Electricity Output from the Maple Ridge Windplant July, August, September 2006”
This material is the work of the author(s) indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.
The copyright of this material resides with the author(s). As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Queries e-mail.
Wind Watch relies entirely on User Contributions |
(via Stripe) |
(via Paypal) |
Share:
Tags: Wind power, Wind energy