Resource Documents by Lesser, Jonathan
Lesser, Jonathan
Biden Administration’s Offshore Wind Fantasy
As this report will demonstrate, the realities of offshore wind planning, development, and construction render the president’s goal unachievable. A single offshore wind project can easily take longer than a decade to develop. Although numerous projects scheduled to be built before 2030 have been announced in the last decade, only one—the 800-MW Vineyard Wind project, to be built off the Massachusetts coast south of Martha’s Vineyard—has begun preliminary construction. And that project is facing at least three lawsuits that are . . . Complete article »
Lesser, Jonathan
New York’s Clean Energy Programs: The High Cost of Symbolic Environmentalism
Abstract: In 2016, the New York Public Service Commission enacted the Clean Energy Standard (CES), under which 50% of all electricity sold by the state’s utilities must come from renewable generating resources by 2030, and emissions of greenhouse gases (GHG) must be reduced by 40%. The CES also incorporates New York’s previous emissions reduction mandate, which requires that the state’s GHG emissions be reduced 80% below 1990 levels by 2050 (the “80 by 50” mandate). Key Findings: Given existing technology, . . . Complete article »
Also try:
Search all of documents for "Lesser, Jonathan".
Search entire site for "Lesser, Jonathan".