Go to multi-category search Â»

ISSUES/LOCATIONS

View titles only
(by date)
List all documents, ordered…

By Title

By Author

View PDF, DOC, PPT, and XLS files on line
RSS

Add NWW documents to your site (click here)

Sign up for daily updates

Keep Wind Watch online and independent!

Donate $10

Donate $5

News Watch

Selected Documents

Research Links

Alerts

Press Releases

FAQs

Publications & Products

Photos & Graphics

Videos

Allied Groups

Resource Documents by FPL Energy

FPL Energy
Wind Farm Easement Agreement – FPL Energy
3.3 Use of Owner’s Property. During the Option Term, Operator and its employees, agents and contractors shall have a non-exclusive right to enter upon the Owner’s Property and the right of ingress and egress over and across the Owner’s Property for the purposes of (i) surveying the Owner’s Property; (ii) performing such other tests and studies as Operator may desire in connection with the Option, including, without limitation, environmental, avian and cultural resource assessments, and geotechnical,foundation and soil tests; provided . . . Complete article »

FPL Energy
Wind Farm Easement Agreement
This Agreement relates to the wind-powered electrical power generation and transmission project known as the “Randolph Wind Energy Center” to be located in Columbia County, Wisconsin. [excerpts:] When installing, maintaining or removing the nacelle and rotor from any Wind Turbine, whether located on or off of Owner’s Property, this Construction Easement also shall permit workers to do the following: (a) (for the purpose of securing tag lines) travel on foot or in a pickup truck, SUV, small forklift or other . . . Complete article »

Also try:
Search all of documents for "FPL Energy".
Search entire site for "FPL Energy".

Get the Facts Follow Wind Watch on Twitter

Wind Watch on Facebook

Share

CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.
Share

 Follow: