LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Council makes change to wind turbine setback 

After more than a year of discussion, Ashfield-Colborne-Wawanosh Twp. has made a decision with its wind turbine setbacks.

Council voted to change the wind turbine setbacks for vacant lots and residences to 450 metres from 400 metres, at the March 3 meeting. The decision came after receiving a response from the Ministry of Environment, which council has been waiting on for several months.

Council has also been listening to concerns of ratepayers and reviewing reports on wind turbines for over a year. Council’s decision to change the setback, will be passed at a future date, if no appeals are made, with the township’s comprehensive zoning bylaw.

“The ministry has completed its review of the G. P. Van Den Berg Dissertation and is in the process of posting this review. Based on this review, the ministry has determined that although its current noise policy for wind turbines does require clarification of some aspects, the ministry’s current noise limit for wind turbines will remain at 40 decibels at the point of reception for the time being. As well, the ministry does not intend to introduce setback distances for wind turbine operations. Municipalities, however, may set requirements for wind turbine set backs under the authority of the Planning Act,” wrote Doris Dumais director of approvals program, environmental assessment and approvals branch for the MOE, in a March 4 letter.

“To date, the ministry’s wind turbine policy review has identified several areas where the existing guidance documentation could be clarified in order to ensure that proponents of wind turbine projects are provided with guidance to properly assess noise emissions, to ensure that the predicted worst case scenario is assessed.

See this week’s Lucknow Sentinel for the full story.

By Sara Bender

Lucknow Sentinel

11 March 2008

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky