Bolton, Rick
“Maple Ridge has a nameplate capacity factor of 240 MW, but from the graph we see that for 40% of the quarter [July, August, September 2006] (1883 hrs), the wind farm produced a paltry 0-30 MW, or 0-12.5% of nameplate capacity. At no time did the output sustain full 240 MW. Indeed, the output was only above half the rated output 15% of the time.”